NHS Trust Prince Phillip Hospital -Llanelli

Sector: Medical & Health

Project size: 53kwp

Products: Award winning Solar Edge & Trina

Situated in the South Wales Prince Phillip NHS Hospital nr Llanelli have a commitment to health & well-being & it is paramount for the trust to have enough electricity to meet the demand for the hospital’s required electricity supplying lighting, Power & Lifesaving machines. Their commitment to sustainable energy & championing the necessity to generate their own clean electricity shows their determination to become more self-sustainable & less reliant on the grid which is a key driver for the NHS & their approach to sustainability.

A commitment was made to champion the cause for an environmentally & sustainable solution for their business

The Installation of a Solaredge solar PV system to aid, benefit & reduce the NHS trust’s rising energy costs on the new building offering a new modern addition to the current hospital’s visual aspect & keeping within the context of modern & more energy demand a SolarEdge Pv system was designed & installed my Mode rn energy. Installing Solar PV means futureproofing electricity costs at today’s price by generating their own clean energy to feed directly into the hospital reducing the reliance on the grid & thus reducing their outgoing energy costs which allows or re-investment into the business for other necessary items.
The award-winning SolarEdge product was chosen due to its many safety features, DC safe shutdown (As recognised by many insurance companies such as Aviva) Online cloud monitoring portal & independent panel harvesting providing more efficient solar projects.

 

The collaboration between the NHS, Vanguard the NHS build primary contractor and Modern Energy was a successful installation

What is great is the commitment by NHS trust to further champion renewable energy solutions across a range of buildings throughout the UK on additional new & existing buildings.

 

PANEL – SJA SOLAR 405 w and 124 PANELS

INVERTER – SOLAREDGE 50kw 3-PHASE UNIT

OPTIMISER – P950 X 62

SYSTEM SAFETY – SOLAREDGE FIRE FIGHTER GATEWAY

ROOFING MOUNTING SYSTEM – VAN DER VALK LOW BALLST FLAT ROOF

CLOUD MONITORING – SOLAREDGE BASED APP – SUPPORTED O&M

ESTIMATED KW PER ANNUM PRODUCED – 44,381 kwhrs

ANNUAL ELECTRIC SAVINGS – £N/A -ZERO EXPORT 100% ENERGY USAGE

ANNUAL ELECTRIC SAVINGS – £22,236.60

TOTAL ANNUAL SAVINGS – £555,912.50

RETURN ON INVESTMENT – 40.1%

PAYBACK PERIOD – 2 YEARS 5 MONTHS

TOTAL SYSTEM COST – £53 414,65

 

Finance Options

(Solar PV systems, Battery storage, LED lighting, Commercial EV Charging, New roof overclad)

Our finance partner can fund 100% of the purchase – including installation cost
No deposit (T & C’s apply) Credit check
They pay the supplier in upfront stage payments to help their cash flow
Decisions within 3 hours
Accessible finance all commercial projects from £10,000 to £1 Million +
Fixed monthly payments
The finance payments are 100% tax deductible
No charges against Land or Property

 

Request A Quote

    Telephone: 07577 886 711

    info@modernenergyelectricalservices.com

    To access the latest in energy efficiency and electrical services, contacting Modern Energy & Electrical Services is your first step towards innovative solutions. Our team of experts is ready to assist with a wide range of services, from advanced lighting optimization and low-energy systems to comprehensive electrical installations and voltage optimization.